What a California Home Improvement Contract Must Include (2026 Checklist)

By , Founder, NameVerse, Inc. · · · 7 min read

Worked examples in this guide are illustrative, not customer data — see our editorial standards.

Most contractors in California are working from a contract they wrote years ago and have patched ever since. The law it has to follow, Business and Professions Code section 7159, is long, specific about wording, and was amended again for 2026. This page is the checklist: what the contract must say, in the order the statute says it, so you can hold your own contract next to it and see what is missing.

When does California require a written home improvement contract?

Whenever the total price of a home improvement job, including all labor, services and materials, is more than $500. That covers work for a homeowner and work for a tenant in the unit they live in. The contract, and any change to it, has to be in writing and signed by both of you before the work it covers begins.

Before any work starts, you must give the customer a copy that both of you have signed and dated. The statute requires this sentence in the contract, in at least 12-point bold type: "You are entitled to a completely filled in copy of this agreement, signed by both you and the contractor, before any work may be started."

What headings and details must the contract include?

The statute names the headings. Use its wording, not your own:

  1. Your name, business address and license number. If a registered home improvement salesperson sold the job, their name and registration number too.
  2. The heading "Home Improvement" in at least 10-point bold type.
  3. "Contract Price," followed by the amount in dollars and cents.
  4. "Finance Charge," stated separately from the contract price, if you charge one.
  5. "Description of the Project and Description of the Significant Materials to be Used and Equipment to be Installed," followed by exactly that.
  6. "Downpayment," if you take one, with the amount and the required statement about the limit (below).
  7. "Schedule of Progress Payments," if any payment falls due before the job is finished. Each payment is stated in dollars and cents and tied to the work, services, materials or equipment it pays for.
  8. "Approximate Start Date," with a statement of what counts as substantial commencement of the work.
  9. "Approximate Completion Date."
  10. "List of Documents to be Incorporated into the Contract," if there are any: plans, specifications, the estimate.
  11. "Note About Extra Work and Change Orders," followed by the statute's paragraph on how a change becomes part of the contract.

The first page also has to show the date the customer signed, and your name, address, email address and phone number, so the customer knows where a cancellation notice goes and who can help them fill it out.

How much can a California contractor take as a down payment?

No more than $1,000 or 10 percent of the contract price, whichever is less. On a $6,000 job the limit is $600. On a $40,000 job it is $1,000. The contract must carry this statement in at least 12-point bold type: "THE DOWNPAYMENT MAY NOT EXCEED $1,000 OR 10 PERCENT OF THE CONTRACT PRICE, WHICHEVER IS LESS."

After the down payment, you cannot collect ahead of the work. The progress payment section must include the statute's warning that it is against the law for a contractor to collect payment for work not yet completed or for materials not yet delivered. That is why the payment schedule has to describe each phase and what it pays for. If you fund larger jobs through staged payments, deposits and progress billing walks through how to structure them.

There is one narrow exception. A contractor with a blanket performance and payment bond on file with the CSLB is not held to the down payment limit. The CSLB describes these bonds as rare.

What notices have to be in the contract or attached to it?

  • Commercial General Liability Insurance (CGL). A statement of whether you carry it, with the insurer's name and phone number if you do.
  • Workers' Compensation Insurance. Either that you have no employees and are exempt, or that you carry it for all employees.
  • Extra work and change orders. A notice telling the customer that a change order is enforceable only if it is written before the changed work starts.
  • Mechanics Lien Warning. The statute supplies the full text, word for word.
  • Information about the Contractors State License Board. Also supplied word for word, in at least 12-point type.
  • Right to cancel. A "Three-Day Right to Cancel" notice, or "Five-Day" when the customer is a senior citizen, in at least 12-point bold type next to a space for the customer's signature, with a detachable "Notice of Cancellation" form in duplicate. Repair work after a declared disaster carries a "Seven-Day Right to Cancel" instead. The three-day notice is not required when the contract is negotiated at your place of business.
  • Lien releases. A statement that once the customer pays for a portion of the work, you will give them a full and unconditional lien release for that portion before any further payment.
  • Performance and payment bond. A notice near the signatures that the customer has the right to require one.

The cancellation notice has to be in the same language you used to sell the job. If you presented it in Spanish, the notice is in Spanish.

What changed in the 2026 version?

Two things most older contracts will not have.

A subcontractor disclosure. The contract must state whether a subcontractor will be used, with a Yes and a No box to check. If the answer is Yes, it must include a set disclaimer saying a list of the subcontractors, with their contact information, license numbers and classifications, will be provided on request. The same disclaimer goes on every change order during the job.

Cancellation by email. The right-to-cancel notices now say the customer may cancel by email as well as by mail or delivery, which is why your email address belongs on the first page. If the notice of cancellation is missing, the statute says the customer may file a complaint with the CSLB.

What does a change order need to say?

A change becomes part of the contract only if it is in writing and signed by both of you before the changed work begins. It has to describe the scope of the change, the amount added to or subtracted from the contract, and the effect on the progress payments or the completion date. A change order that skips those is not enforceable against the customer, although the statute says that does not rule out recovering payment for work performed under legal or equitable remedies meant to prevent unjust enrichment. Do not plan on that. Write the order first. How to price and document a change order covers the pricing side.

Does this apply to every job?

No. Service and repair contracts follow their own, shorter rules in sections 7159.10 through 7159.14. Jobs at $500 or under fall outside the definition. Swimming pools carry extra requirements, including a plan and scale drawing. Everything else done to an existing home for an owner or tenant is very likely a home improvement contract.

Leaving out a required item is cause for discipline against your license. It also hands a customer who does not want to pay an argument they would not otherwise have.

Check your own contract

Print your contract and go down the two lists above with a pen. If your contract was written before 2026, check the subcontractor box and the email address on page one first, since both are new. Fix the Word file once, check it against the current rules on the CSLB site (or your own state's licensing board outside California), have an attorney read it, and stop editing it job by job.

When the contract is right, Tabsy Express turns it into something you send from the driveway. Upload your Word file and it becomes your signing template. Your client signs in their browser from a text or email link, with no app and no account. $39 a month after a 30-day free trial, and no charge until the trial ends. See Tabsy Express.

Built for contractors

Estimate, contract, invoice, paid. One system.

Tabsy runs the job from the first estimate to the last payment. Every subscription starts with a 30-day free trial, and nothing is charged until the trial ends.

Working solo

Tabsy Express

Estimates, contracts your client signs in their browser, invoices and card or ACH payments, all in one place.

$39/month after your 30-day free trial

Start free trial See Tabsy Express →

Running a crew

Tabsy LPM

Leads, estimates, contracts, projects, dispatching and billing for teams of 2 to 30, on web, iOS and Android.

From $70/month for 2 users, every feature

See Tabsy LPM Compare plans and pricing →

Quick answers from this guide

When does California require a written home improvement contract?

Whenever the total price of a home improvement job, including all labor, services and materials, is more than $500. That covers work for a homeowner and work for a tenant in the unit they live in. The contract, and any change to it, has to be in writing and signed by both of you before the work it covers begins.

What headings and details must the contract include?

The statute names the headings. Use its wording, not your own:

How much can a California contractor take as a down payment?

No more than $1,000 or 10 percent of the contract price, whichever is less. On a $6,000 job the limit is $600. On a $40,000 job it is $1,000. The contract must carry this statement in at least 12-point bold type: "THE DOWNPAYMENT MAY NOT EXCEED $1,000 OR 10 PERCENT OF THE CONTRACT PRICE, WHICHEVER IS LESS."

What changed in the 2026 version?

Two things most older contracts will not have.

What does a change order need to say?

A change becomes part of the contract only if it is in writing and signed by both of you before the changed work begins. It has to describe the scope of the change, the amount added to or subtracted from the contract, and the effect on the progress payments or the completion date. A change order that skips those is not enforceable against the customer, although the statute says that does not rule out recovering payment for work performed under legal or equitable remedies meant to prevent unjust enrichment. Do not plan on that. Write the order first.

Does this apply to every job?

No. Service and repair contracts follow their own, shorter rules in sections 7159.10 through 7159.14. Jobs at $500 or under fall outside the definition. Swimming pools carry extra requirements, including a plan and scale drawing. Everything else done to an existing home for an owner or tenant is very likely a home improvement contract.

Free checklist

Invoice clearly, get paid faster, and chase fewer late payments — from estimate to final payment.

Get the free Get-Paid-Faster checklist
30 days free · $0 today
Every feature · Cancel anytime.
Start Free Trial